Federal Center South

  • 1,100 tons
  • LEED Gold

Project Highlights

  • Design build and changes throughout fabrication required close coordination between B&B, contractor and contractor's detailing
  • Working with the detailer to overcome problems with CNC code for PythonX
  • Opposing raked walls
  • Curved wall construction